Key Features of Coal Mill in Thai Nguyen 5000 TPD Cement Plant

Key Features of Coal Mill in Thai Nguyen 5000 TPD Cement Plant

The coal mill plays a pivotal role in the Thai Nguyen 5000 TPD cement plant, ensuring efficient pulverization of coal to meet the energy demands of the kiln system. This article delves into the critical features that make our coal mill stand out in terms of performance, reliability, and environmental compliance.

1. High Grinding Efficiency & Energy Savings

Our coal mill integrates advanced grinding technology, achieving a 40-50% reduction in energy consumption compared to traditional ball mills. The optimized grinding curve design ensures higher throughput with lower power input, directly reducing operational costs.

Coal mill grinding chamber with optimized roller design

2. Eco-Friendly Operation

Equipped with a pulse dust collector and noise-reducing mufflers, the mill operates under negative pressure, eliminating dust emissions and maintaining noise levels below 75 dB. This aligns with Thailand’s stringent environmental regulations.

3. Robust Design for Heavy-Duty Performance

The mill’s no-rolling-bearing grinding chamber eliminates risks of bearing failures, while its reversible roller structure simplifies maintenance. Key components are made from wear-resistant alloys, extending service life by 2.5x.

4. Recommended Product: MW Ultrafine Grinding Mill

For auxiliary processes requiring ultra-fine coal powder (e.g., fuel for calciners), our MW Ultrafine Grinding Mill excels with:

  • Capacity: 0.5–25 tph (325–2500 mesh adjustability)
  • Features: German cage-type powder selector, external lubrication, and zero screw-in-chamber design
  • Applications: Ideal for petroleum coal, limestone, and slag powder production

MW Ultrafine Grinding Mill in industrial setting

5. Automation & Digital Control

The mill’s PLC system enables remote monitoring and automatic adjustment of grinding pressure, feed rate, and fineness, ensuring consistent product quality with minimal manual intervention.

6. Case Study: Seamless Integration in Thai Nguyen

Since installation, the coal mill has achieved 98% operational uptime, with a coal powder fineness of ≤5% R90μm. Paired with our LUM Ultrafine Vertical Mill (for alternative fuel preparation), the plant has cut energy costs by 35%.

Thai Nguyen 5000 TPD cement plant with coal mill in operation

For inquiries about our coal grinding solutions, contact our team to optimize your cement production line.